SUPPLY REFERENCE LIST | ||||||
SL. NO | Customer Name | Project | Supplied Items | PO Ref Year | Supplied Quantity | Status |
1 | SMS Meer India Pvt Ltd | Bhilai Steel Plant | Trench Cover | April 2016 | 17.20 MT | Executed |
2 | Larsen & Toubro Ltd. | NTPC – TANDA Thermal Power Project 2 x 660 MW | Bottom Ash Hopper Accessories: Feed Gate Enclosure 36″ x 36″ Door Access 900 x 900 |
January 2018 | 63.50 MT | Executed |
3 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | Air Lock Vessel Capacity : 3.35m3 |
March 2018 | 16 Nos | Executed |
4 | Thapar Institute of Engineering & Technology | Joint Research Project of TIET & NTPC | Blow Tank Vessel Capacity : 0.8m3 |
May 2018 | 1 Nos | Executed |
5 | Thapar Institute of Engineering & Technology | Joint Research Project of TIET & NTPC | Transfer Vessel Capacity : 1m3 |
May 2018 | 1 Nos | Executed |
6 | Thapar Institute of Engineering & Technology | Joint Research Project of TIET & NTPC | Air Receiver Capacity : 3m3 |
May 2018 | 1 Nos | Executed |
7 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | Collector Tank Assembly with ALLOY CI Liner | March 2018 | 8 Nos | Executed |
8 | BGR Energy Systems Limited | 1 x 800 MW North Chennai STPP STAGE III | BA SILO Fluidizing Assembly – Assorted Sizes | June 2018 | 15 MT | Executed |
9 | Larsen & Toubro Ltd. | NTPC – Khargone AHP 2 x 600 MW STPP Project | Flushing Apparatus Below Economiser Hopper | June 2018 | 16 Nos | Executed |
10 | Larsen & Toubro Ltd. | NTPC – TANDA Thermal Power Project 2 x 660 MW | Flushing Apparatus Below Economiser Hopper | June 2018 | 16 Nos | Executed |
11 | IFFCO | IFFCO Paradip | Ash Unloader Complete Assembly With Drive arrangement And Control Panel Capacity : 100 TPH |
Auguest 2018 | 1 Nos | Executed |
12 | IFFCO | IFFCO Paradip | Spares Supply : Vent Filter Bag & Cage | December 2019 | 100 Sets | Executed |
13 | BGR Energy Systems Limited | 2 x 660 MW OPGCL Odisha | Air Lock Vessel Capacity : 4.0m3 |
December 2019 | 12 Nos | Executed |
14 | Andritz Technologies Pvt Ltd | Mishra Dhatu Nigam Ltd | Casing Fabrication & Machinary | September 2020 | 12 MT | Executed |
15 | Andritz Technologies Pvt Ltd | Mishra Dhatu Nigam Ltd | Maintenance Platform of Both Furnae Roof and Door Mast for 12 MT Capacity LPG Heated Chamber Furnace | October 2020 | 2 MT | Executed |
16 | Andritz Technologies Pvt Ltd | Mishra Dhatu Nigam Ltd | Maintenance Platform of Both Furnae Roof and Door Mast for 20 MT Capacity LPG Heated Chamber Furnace | October 2020 | 3.5 MT | Executed |
17 | Andritz Technologies Pvt Ltd | Mishra Dhatu Nigam Ltd | Fabrication Pipe Material for 12 MT & 20 MT Fire Furnace | October 2020 | 8.60 MT | Executed |
18 | Larsen & Toubro Ltd. | Khurja THDC 2 x 600 MW | Centerwel Assembly for Surge Tank | June 2021 | 1.585 MT | Executed |
19 | Larsen & Toubro Ltd. | Khurja THDC 2 x 600 MW | Battle Assembly for Settling Tank | June 2021 | 5.720 MT | Executed |
20 | Larsen & Toubro Ltd. | Khurja THDC 2 x 600 MW | Silo Accessories & Bin Outlet Hopper | June 2021 | 4.30 MT | Executed |
21 | Larsen & Toubro Ltd. | Khurja THDC 2 x 600 MW | Fluidizer Arrangement Assorted Size | July 2021 | 11 MT | Executed |
22 | VA Tech Wabag Ltd | Ganga STP Project | Setting Tank for Scrubber Package | July 2022 | 3 Nos | Executed |
23 | VA Tech Wabag Ltd | Ganga STP Project | Demister Pot for Scrubber Package | July 2022 | 3 Nos | Executed |
24 | Larsen & Toubro Ltd. | NTPC Patratu STPS 3 x 800 MW | Target Box : Type-I | September 2022 | 6 MT | Executed |
25 | Larsen & Toubro Ltd. | NTPC Patratu STPS 3 x 800 MW | Target Box : Type-II | September 2022 | 8 MT | Executed |
26 | BGR Energy Systems Limited | 1 x 800 MW North Chennai STPP STAGE III | AHS – Bottom Ash Vessel Capacity : 2m3 |
November 2022 | 4 Nos | Executed |
27 | BGR Energy Systems Limited | 1 x 800 MW North Chennai STPP STAGE III | AHS – FA Air Lock Vessel Capacity : 5.42m3 |
November 2022 | 12 Nos | Executed |
28 | BGR Energy Systems Limited | 1 x 800 MW North Chennai STPP STAGE III | AHS – ECO Ash Vessel Capacity : 1m3 |
November 2022 | 4 Nos | Executed |
29 | Larsen & Toubro Ltd. | NTPC Patratu STPS 3 x 800 MW | Fluidizer Arrangement | December 2022 | 8.90 MT | Executed |
30 | Larsen & Toubro Ltd. | NTPC Patratu STPS 3 x 800 MW | Silo Accessories & Bin Outlet Hopper | February 2023 | 24 MT | Executed |
31 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Sluice Gate Assembly | September 2023 | 6 Nos | Executed |
32 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Sluice Gate Enclosure | September 2023 | 6 Nos | Executed |
33 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Air Oil Converter Tank | September 2023 | 6 Nos | Executed |
34 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Drip Pan Assembly Type – I |
September 2023 | 3 Nos | Executed |
35 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Drip Pan Assembly Type – II |
September 2023 | 3 Nos | Executed |
36 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Central Decanter | September 2023 | 3 Nos | Executed |
37 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Side Decanter | September 2023 | 18 Nos | Executed |
38 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Bottom Cone for Hydrobin | September 2023 | 3 Nos | Executed |
39 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Discharge Chute Type – I |
September 2023 | 3 Nos | Executed |
40 | BGR Energy Systems Limited | 1 x 800 MW Dr. NTTPS Stage V | AHS – Hydrobin Discharge Chute Type – II |
September 2023 | 3 Nos | Executed |
41 | Larsen & Toubro Ltd. | Lower Suktel UGPL Irrigation Project | Rolled & Fabricated Pipe OD 3128 mm x 25 mm Thk x 2 M LG | April 2024 | 24 Nos | Executed |
42 | Larsen & Toubro Ltd. | NTPC AHP Patratu | AIR VESSEL CAPACITY : 0.76m3 |
April 2024 | 12 Nos | Executed |
43 | Larsen & Toubro Ltd. | NTPC AHP Patratu | AIR VESSEL CAPACITY : 0.65m3 |
April 2024 | 16 Nos | Executed |
44 | Larsen & Toubro Ltd. | NTPC AHP Patratu | AIR VESSEL CAPACITY : 1.13m3 |
April 2024 | 8 Nos | Executed |
45 | Larsen & Toubro Ltd. | NTPC AHP Patratu | AIR VESSEL CAPACITY : 1.50m3 |
April 2024 | 4 Nos | Executed |
46 | Larsen & Toubro Ltd. | NTPC AHP Patratu | Air Lock Vessel Capacity : 2.21m3 |
January 2020 AMD April 2024 |
24 Nos | Executed |
47 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Water Pump Filter 500 NB – SS316 |
May 2024 | 10 Nos | Executed |
48 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Water Pump Filter 450 NB – SS316 |
May 2024 | 4 Nos | Executed |
49 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Water Pump Filter 250 NB – SS316 |
May 2024 | 2 Nos | Executed |
50 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Buffer Hopper Liner , MOC SS 420 Hardened to 350 BHN Minimum Argmnt Part – 1 |
May 2024 | 72 Nos | Executed |
51 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Buffer Hopper Liner, MOC SS 420 Hardened to 350 BHN Minimum Argmnt Part – 2 |
May 2024 | 72 Nos | Executed |
52 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Surge Tank Below FA SILO Type – A |
May 2024 | 6 Nos | Executed |
53 | BGR Energy Systems Limited | Ghatampur Thermal Power Project | AHS – Surge Tank Below FA SILO TYPE – B |
May 2024 | 6 Nos | Executed |
54 | Larsen & Toubro Ltd. | Rajghat MVS | Pipe Spool Flange Ends Galvanized Associted Size |
May 2024 | 90 MT | Executed |
55 | Larsen & Toubro Ltd. | Water Supply Project Jagatsinghpur |
Pipe Support | July 2024 | 36 MT | Executed |
56 | BTL EPC LTD | Yadadri Thermal Power Station, Nalgonda 5 x 800 MW | Hydromix Dust Conditioner | May 2024 | 5 Nos | Under Execution |
57 | AS Cooling Technologies | 3 x 35 MW Power Plant at Sponge Iron Complex C/O – Lloyds Metals and Energy Limited |
Riser Pipe 800 NB x 8 mm Thk Fitted with Miter Bend & 38 mm Thk flange MOC : A105 | June 2024 | 18 MT | Under Execution |
58 | AS Cooling Technologies | 2 x 800 MW Ultra STPP ( Part II ) Singrauli C/O – Mahan Energen LTD |
Gear Box and Motor Base Frame , HOT DIP GALVANIZED | September 2024 | 56 Sets | Under Execution |