MHC Conveying Systems

SUPPLY REFERENCE LIST
SL. NO Customer Name Project Supplied Items PO Ref Year Supplied Quantity Status
1 SMS Meer India Pvt Ltd Bhilai Steel Plant Trench Cover April 2016 17.20 MT Executed
2 Larsen & Toubro Ltd. NTPC – TANDA Thermal Power Project 2 x 660 MW

Bottom Ash Hopper Accessories:

Feed Gate Enclosure 36″ x 36″

Door Access 900 x 900
Door Access 24″
Wall Cooling Spray Pipe
Set Stop Pipe
4″ Window Assembly

January 2018 63.50 MT Executed
3 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V Air Lock Vessel
Capacity : 3.35m3
March 2018 16 Nos Executed
4 Thapar Institute of Engineering & Technology Joint Research Project of TIET & NTPC Blow Tank Vessel
Capacity : 0.8m3
May 2018 1 Nos Executed
5 Thapar Institute of Engineering & Technology Joint Research Project of TIET & NTPC Transfer Vessel
Capacity : 1m3
May 2018 1 Nos Executed
6 Thapar Institute of Engineering & Technology Joint Research Project of TIET & NTPC Air Receiver
Capacity : 3m3
May 2018 1 Nos Executed
7 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V Collector Tank Assembly with ALLOY CI Liner March 2018 8 Nos Executed
8 BGR Energy Systems Limited 1 x 800 MW North Chennai STPP STAGE III BA SILO Fluidizing Assembly – Assorted Sizes June 2018 15 MT Executed
9 Larsen & Toubro Ltd. NTPC – Khargone AHP 2 x 600 MW STPP Project Flushing Apparatus Below Economiser Hopper June 2018 16 Nos Executed
10 Larsen & Toubro Ltd. NTPC – TANDA Thermal Power Project 2 x 660 MW Flushing Apparatus Below Economiser Hopper June 2018 16 Nos Executed
11 IFFCO IFFCO Paradip Ash Unloader Complete Assembly With Drive arrangement And Control Panel
Capacity : 100 TPH
Auguest 2018 1 Nos Executed
12 IFFCO IFFCO Paradip Spares Supply : Vent Filter Bag & Cage December 2019 100 Sets Executed
13 BGR Energy Systems Limited 2 x 660 MW OPGCL Odisha  Air Lock Vessel
Capacity : 4.0m3
December 2019 12 Nos Executed
14 Andritz Technologies Pvt Ltd Mishra Dhatu Nigam Ltd Casing Fabrication & Machinary September 2020 12 MT Executed
15 Andritz Technologies Pvt Ltd Mishra Dhatu Nigam Ltd Maintenance Platform of Both Furnae Roof and Door Mast for 12 MT Capacity LPG Heated Chamber Furnace October 2020 2 MT Executed
16 Andritz Technologies Pvt Ltd Mishra Dhatu Nigam Ltd Maintenance Platform of Both Furnae Roof and Door Mast for 20 MT Capacity LPG Heated Chamber Furnace October 2020 3.5 MT Executed
17 Andritz Technologies Pvt Ltd Mishra Dhatu Nigam Ltd Fabrication Pipe Material for 12 MT & 20 MT Fire Furnace October 2020 8.60 MT Executed
18 Larsen & Toubro Ltd. Khurja THDC 2 x 600 MW Centerwel Assembly for Surge Tank June 2021 1.585 MT Executed
19 Larsen & Toubro Ltd. Khurja THDC 2 x 600 MW Battle Assembly for Settling Tank June 2021 5.720 MT Executed
20 Larsen & Toubro Ltd. Khurja THDC 2 x 600 MW Silo Accessories & Bin Outlet Hopper June 2021 4.30 MT Executed
21 Larsen & Toubro Ltd. Khurja THDC 2 x 600 MW Fluidizer Arrangement Assorted Size July 2021 11 MT Executed
22 VA Tech Wabag Ltd Ganga STP Project Setting Tank for Scrubber Package July 2022 3 Nos Executed
23 VA Tech Wabag Ltd Ganga STP Project Demister Pot for Scrubber Package July 2022 3 Nos Executed
24 Larsen & Toubro Ltd. NTPC Patratu STPS 3 x 800 MW Target Box : Type-I September 2022 6 MT Executed
25 Larsen & Toubro Ltd. NTPC Patratu STPS 3 x 800 MW Target Box : Type-II September 2022 8 MT Executed
26 BGR Energy Systems Limited 1 x 800 MW North Chennai STPP STAGE III AHS – Bottom Ash Vessel
Capacity : 2m3
November 2022 4 Nos Executed
27 BGR Energy Systems Limited 1 x 800 MW North Chennai STPP STAGE III AHS – FA Air Lock Vessel
Capacity : 5.42m3
November 2022 12 Nos Executed
28 BGR Energy Systems Limited 1 x 800 MW North Chennai STPP STAGE III AHS – ECO Ash Vessel
Capacity : 1m3
November 2022 4 Nos Executed
29 Larsen & Toubro Ltd. NTPC Patratu STPS 3 x 800 MW Fluidizer Arrangement December 2022 8.90 MT Executed
30 Larsen & Toubro Ltd. NTPC Patratu STPS 3 x 800 MW Silo Accessories & Bin Outlet Hopper February 2023 24 MT Executed
31 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Sluice Gate Assembly September 2023 6 Nos Executed
32 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Sluice Gate Enclosure September 2023 6 Nos Executed
33 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Air Oil Converter Tank September 2023 6 Nos Executed
34 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Drip Pan Assembly
Type – I
September 2023 3 Nos Executed
35 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Drip Pan Assembly
Type – II
September 2023 3 Nos Executed
36 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Central Decanter September 2023 3 Nos Executed
37 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Side Decanter September 2023 18 Nos Executed
38 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Bottom Cone for Hydrobin September 2023 3 Nos Executed
39 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Discharge Chute
Type – I
September 2023 3 Nos Executed
40 BGR Energy Systems Limited 1 x 800 MW Dr. NTTPS Stage V AHS – Hydrobin Discharge Chute
Type – II
September 2023 3 Nos Executed
41 Larsen & Toubro Ltd. Lower Suktel UGPL Irrigation Project Rolled & Fabricated Pipe OD 3128 mm x 25 mm Thk x 2 M LG April 2024 24 Nos Executed
42 Larsen & Toubro Ltd. NTPC AHP Patratu AIR VESSEL
CAPACITY : 0.76m3
April 2024 12 Nos Executed
43 Larsen & Toubro Ltd. NTPC AHP Patratu AIR VESSEL
CAPACITY : 0.65m3
April 2024 16 Nos Executed
44 Larsen & Toubro Ltd. NTPC AHP Patratu AIR VESSEL
CAPACITY : 1.13m3
April 2024 8 Nos Executed
45 Larsen & Toubro Ltd. NTPC AHP Patratu AIR VESSEL
CAPACITY : 1.50m3
April 2024 4 Nos Executed
46 Larsen & Toubro Ltd. NTPC AHP Patratu Air Lock Vessel
Capacity : 2.21m3
January 2020
AMD April 2024
24 Nos Executed
47 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Water Pump Filter
500 NB – SS316
May 2024 10 Nos Executed
48 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Water Pump Filter
450 NB – SS316
May 2024 4 Nos Executed
49 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Water Pump Filter
250 NB – SS316
May 2024 2 Nos Executed
50 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Buffer Hopper Liner , MOC SS 420 Hardened to 350 BHN Minimum
Argmnt Part – 1
May 2024 72 Nos Executed
51 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Buffer Hopper Liner, MOC SS 420 Hardened to 350 BHN Minimum
Argmnt Part – 2
May 2024 72 Nos Executed
52 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Surge Tank Below FA SILO
Type – A
May 2024 6 Nos Executed
53 BGR Energy Systems Limited Ghatampur Thermal Power Project AHS – Surge Tank Below FA SILO
TYPE – B
May 2024 6 Nos Executed
54 Larsen & Toubro Ltd. Rajghat MVS Pipe Spool Flange Ends Galvanized
Associted Size
May 2024 90 MT Executed
55 Larsen & Toubro Ltd. Water Supply Project
Jagatsinghpur
Pipe Support July 2024 36 MT Executed
56 BTL EPC LTD Yadadri Thermal Power Station, Nalgonda 5 x 800 MW Hydromix Dust Conditioner May 2024 5 Nos Under Execution
57 AS Cooling Technologies 3 x 35 MW Power Plant at Sponge Iron Complex
C/O – Lloyds Metals and Energy Limited
Riser Pipe 800 NB x 8 mm Thk Fitted with Miter Bend & 38 mm Thk flange MOC : A105 June 2024 18 MT Under Execution
58 AS Cooling Technologies 2 x 800 MW Ultra STPP ( Part II ) Singrauli
C/O – Mahan Energen LTD
Gear Box and Motor Base Frame , HOT DIP GALVANIZED September 2024 56 Sets Under Execution